What 1 MLD really costs: Aquatron against MBBR, SBR and MBR

Capital cost is where the comparison starts, but the operating gap is what compounds over a 50-year design life.

Aquatron 1 MLD

₹5.14 Cr

MBR / SBR / MBBR

₹7.61 / ₹8.24 / ₹9.15 Cr

OPEX

Up to 80% lower

Design life

50 yrs vs 15–20

For a 1 MLD plant the indicative capital cost works out to ₹5.14 Cr for Aquatron, against ₹7.61 Cr for MBR, ₹8.24 Cr for SBR and ₹9.15 Cr for MBBR. That is roughly 35% lower project CAPEX at the top of the range.

The operating side widens the gap. Around 65% less electricity, up to 80% lower annual running cost, no sludge handling and no dedicated operator up to 500 KLD — these are recurring numbers, not one-time ones.

Design life matters too. Conventional routes are typically planned around 15 to 20 years; the Aquatron process is designed for 50, with 300+ plants in India and 12,000+ worldwide behind that figure.